NEW STORM DRAIN COVERSRIP RAP BEHIND BUILDING 12NEW ROOFING PROJECTBASIN SIDEWALK TEAR OUT AND REPLACE.

This slideshow requires JavaScript.

ROOFING PROJECT PHASE 1 COMPLETE

            1. PHASE 2 TO BEGIN SPRING 2021.

RIP RAP BEHIND BUILDING 12 COMPLETE.

NEW CUSTOM STORM DRAIN GRATES INSTALLED.

BASIN SIDEWALK RESTORATION COMPLETE.

NEW BEACH ACCESS GATE INSTALLED WITH DOOR CODE.

GROUND LIGHTS REPAIRED

SIGN INSTALLED AND LIGHTING IS COMING.

 

 

DON’T FORGET IT IS HOT OUT HERE AND THE PAVEMENT IS STILL SOFT!

PLEASE BE MINDFUL ALWAYS AND STAY SAFE!

tHE PAVING PROJECT IS COMPLETE PLEASE BE ADVISED THAT THE ASPHALT IS STILL VERY SOFT AND WE NEED TO NOT DIG OUT TIRES INTO THE PAVEMENT. PLEASE BE CAUTIOUS AS TO NOT TURN YOUR STEERING WHEEL WHILE THE VEHICLE IS NOT IN MOTION.

 let’s protect our investment!