NEW STORM DRAIN COVERSRIP RAP BEHIND BUILDING 12NEW ROOFING PROJECTBASIN SIDEWALK TEAR OUT AND REPLACE.

This slideshow requires JavaScript.

ROOFING PROJECT PHASE 1 COMPLETE

            1. PHASE 2 TO BEGIN SPRING 2021.

RIP RAP BEHIND BUILDING 12 COMPLETE.

NEW CUSTOM STORM DRAIN GRATES INSTALLED.

BASIN SIDEWALK RESTORATION COMPLETE.

NEW BEACH ACCESS GATE INSTALLED WITH DOOR CODE.

GROUND LIGHTS REPAIRED

SIGN INSTALLED AND LIGHTING IS EXPECTED BY 12/8/2020